move-fast-and-fix-things.md: 'The Critical Infrastructure Adaptation'
section in Rule 5. OT/NT environments where full greenfield is impossible.
Five-layer adapted stack: IT greenfield protects OT, OT config as code,
manual operation as fallback, compartmentalisation as partial burn,
long-cycle planned refresh. OT greenfield test with 4h/48h/2w targets.
vertical-power-utilities.md: New 'The Controlled Burn Adaptation' section.
Full treatment of when greenfield is not an option. Five-layer OT-adapted
stack. Explicit acceptance statement framework for genuinely irreplaceable
OT components (name, isolate, monitor, plan replacement). The OT greenfield
test. Reference back to Rule 5.
Co-Authored-By: Tom Kracmar <tom+claude@cat6.cz>