Commit Graph

2 Commits

Author SHA1 Message Date
Claude Sonnet 4.6 bcebf8ebb3 feat: Add critical infrastructure adaptation for Rule 5 (greenfield)
move-fast-and-fix-things.md: 'The Critical Infrastructure Adaptation'
section in Rule 5. OT/NT environments where full greenfield is impossible.
Five-layer adapted stack: IT greenfield protects OT, OT config as code,
manual operation as fallback, compartmentalisation as partial burn,
long-cycle planned refresh. OT greenfield test with 4h/48h/2w targets.

vertical-power-utilities.md: New 'The Controlled Burn Adaptation' section.
Full treatment of when greenfield is not an option. Five-layer OT-adapted
stack. Explicit acceptance statement framework for genuinely irreplaceable
OT components (name, isolate, monitor, plan replacement). The OT greenfield
test. Reference back to Rule 5.

Co-Authored-By: Tom Kracmar <tom+claude@cat6.cz>
2026-06-05 06:58:07 +00:00
tomas.kracmar 763da003d3 Initial commit: antifragile cybersecurity consulting blueprint
Complete repository of frameworks, playbooks, and assessment resources
for cybersecurity consultations focused on antifragile enterprise design.

Includes:
- Core philosophy and manifest (5 pillars)
- 12 modular engagement packages
- AI sovereignty and operations frameworks
- Zero-budget vulnerability discovery and hardening playbooks
- M365 E3 hardening and antifragile project plans
- Osquery sovereign discovery platform blueprint
- Perimeter scanning capability guide
- AI-assisted TVM blueprint for AI-powered adversaries
- Vertical specializations: banking, telco, power/utilities
- CIS Controls v8 and NIST CSF 2.0 mappings
- Risk registers and assessment templates
- C-suite conversation guide and business case templates
2026-05-09 16:53:22 +02:00