chore(release): prepare for 1.13.0

This commit is contained in:
missytake
2026-09-22 15:18:38 +02:00
parent b5f0d5f268
commit 4ffb501c5e
2 changed files with 36 additions and 3 deletions
+33
View File
@@ -1,5 +1,38 @@
# Changelog for chatmail deployment
## [1.13.0] - 2026-09-22
### Bug Fixes
- Actually use UTC time instead of just seemingly using it
### Documentation
- Describe Madmail v2 as a Rust chatmail relay
### Features
- Serve an APPVERSIONS.json index file to clients via IMAP metadata
- *(mtail)* Deploy filtermail.mtail and gate mtail rule copy on mtail_address
- *(mtail)* Validate programs during deploy
- Move doveauth from dictproxy to lua/http
- Distinguish AUTHENTICATION_FAILED/UNAVAILABLE login failures
### Miscellaneous Tasks
- Try to fix lack of RFC822 item support in madmail and make CI pass
- Un-hardcode executable paths in some systemd service files
- Follow the new mtail release source, upgrade 3.0.8 to 3.4.9
- *(cmdeploy)* Refactor all pins into pins.py
- *(doc)* Use sphinx roles for referencing repository files and dirs
- update deltachat-android link to 2.59.1
### Testing
- Integrate lua testing into regular pytest run for push notifications
- Cleanup and allow a repo-root level "pytest -n6" to succeed.
- [**breaking**] Remove global registration of pytest plugins
## [1.12.0] - 2026-07-31
### Breaking Changes
+3 -3
View File
@@ -1,12 +1,12 @@
# Releasing a new version of chatmail relay
For example, to release version 1.13.0 of chatmail relay, do the following steps.
For example, to release version 1.14.0 of chatmail relay, do the following steps.
1. Update the changelog: `git cliff --unreleased --tag 1.13.0 --prepend CHANGELOG.md` or `git cliff -u -t 1.13.0 -p CHANGELOG.md`.
1. Update the changelog: `git cliff --unreleased --tag 1.14.0 --prepend CHANGELOG.md` or `git cliff -u -t 1.14.0 -p CHANGELOG.md`.
2. Open the changelog in the editor, edit it if required.
3. Commit the changes to the changelog with a commit message `chore(release): prepare for 1.9.0`.
3. Commit the changes to the changelog with a commit message `chore(release): prepare for 1.14.0`.
4. Open a PR with the new commit, merge it to main after review.